Mine Project Engineer (Open Pit) / Горный инженер проекта (ОГР)
Описание
Far khat Ra khmatullin
Kyrgyzstan, +996 -788 -685 -459 ● Farhat.Rahmatullin@gmail.com ● linkedin.com/in/ rakhmatullin f
Education :
Kyrgyz -Russian Slavic University , Hydraulic Engineer 2002 – 2007
Institute of Mining , Min ing Engineer 2014 – 2017
Work experience:
Kumtor Gold Company Sr. Hydraulic Engineer Present
Tailing d am design ; Tailing d am monitoring data analysis ; Tailings dump stability analysis ; reporting .
Kumtor Gold Company Sr. Geotechnical Engineer 2018 – 2020
Development of a geotechnical model; Analysis of geotech monitoring data; Slope Stability analysis
Kumtor Gold Company Mine Plan Engineer 2017
Pit wall optimization; Long - and short -term mining projects; mining optimization
Kumtor Gold Company Geotechnical Engineer 2016
Geotechnical monitoring (inclinometers, thermistors, piezometers), entering data into the database
Kumtor Gold Company Surveyor 2015
Kumtor Gold Company Tailing Dam Technician 2014
INEO GDF SUEZ » Civil engineer 2009 –2014
Palladex Geotechservice Drilling foreman 2009
Task Force International AutoCAD drafter 2008
Азия Руд Проект Engineer 200 7
Institute of Rock P hysics and Mechanics Engineer 2005 – 200 6
• Pit design, Waste Dump design, Pit wall optimization, Slope Stability analysis (Open pit walls,
waste dumps, tailing dam), A nalysis of geotechnical monitoring data .
• Stability assessment of slopes based on data analy sis of on -site observations
• Analyze of statistical and dynamical stability of slopes and dumps in the Rocscience software
Field experience :
• Geotechnical monitoring (Piezometers, Inclinometers , Thermistors) Sieve Analysis, Proctor
Analysis, Compaction Test (Troxler), Surveyin g, Kumtor Mine Site 201 4-20 20
• Surveying using GPS, Scanners and total station. Sitting of explosive holes and blocks, outlines
of benches, control of design parameters of Open Pit and Waste Dumps. 2015
• Supervision of the Tailings Dam facilities on the Kumtor Mine 201 3
• Construction of 110 kV transmission lines (foundations, towers, wire stringing ) 2010 - 2012
• Topographical survey 201 0 - 201 4
• Exploration drilling in the goldfield mines 2009
• Geotechnical investigation. Drilling of geotechnical boreholes . 2008
• Engineering investigations of uranium Tailing s Dams b y the World Bank project 2006
• Ground sampling in the foundation of the Tailing dam at the Kumtor Gold Mine 2005
Training
• Fundamentals of Tailings Engineering Colorado State University Online 2021
• Tailings Storage Facilities and Water Management Transeuropean Centre 2021
• Tailings Disposal Facility Design • Colorado State University Online 2020
• Key Elements of Mine Water Management and Slope Stability Ankara Turkey 2019
• Design of Overhead Transmission Lines using PLS -CADD Paris, France 2012
Knowledge of computer programs
An excellent knowledge of MSOffice, AutoCAD CIVIL 3D , AutoCAD Map 3D, Gemcom GEMS,
Datamine Software , PLS CADD, Access, Rocscience software , G eotechnical Data Base software
26 октября, 2016
Наталья
Город
Москва
Возраст
36 лет (17 мая 1988)
26 октября, 2016
Григорий
Город
Москва
Возраст
53 года (29 декабря 1969)
28 октября, 2016
Мадия
Город
Москва
Возраст
53 года ( 5 июня 1971)