Commissioning Supervisor (process engineer) \ Инженер Технолог
Venkateswara Rao Kandula
Город
Москва
Описание
VENKATESWARA RAO KANDULA
Contact No.: +91 -8008800917, +91 -9010404317 || E -Mail: kvrao2004@gmail.com
CONSTRUCTION PROFESSIONAL
OIL & GAS (Refinery), POL, LPG (Oil & Gas) Cross Country Pipe Lines & Shutdown/ Turn Around Projects,
Power Plants (Thermal & Naphtha/Gas -Based) projects including Fixed & Floating Roof TANKS including
Firefighting Systems and various works in Steel Plant including Power Plant Structures, and Multi Industrial
Steel Structural Building Proj ects .
PROFILE
Profile Male, 58, Married ,
Date of Birth 10 th June, 1962
Nationality Indian
Current Location Vijayawada, Andhra Pradesh , India .
Address Door No - 34 – 98, Near D. A. V. Public School, Chaitanya Nagar, Ibrahimpatnam Post -
521456, Krishna District (A.P) ANDHRA PRADESH INDIA.
Language Known Telugu, English, and Hindi
Passport Details R8517838 ; Valid till: 22/01/20 28
Construction Experience 33 Years.
Last Organisation M/s. Lanco Infratech Ltd., HPCL R&D Centre (GRIHA Building, Platinum rated), Bangalore
Last Position Project Manager
Preferred Location India and abroad
Availability for Joining Immediate.
Salary Expectation Not Specified / Negotiable
SNAPSHOT
An astute professional with over 33 years of experience in Project Management in OIL & GAS (Refinery ), and 18 years Steel
Plant, Power Plant and Industrial Building Projects. Quick adaptability to changing technologies to meet new requirements
suc cessfully with a systematic and organized approach for increased efficiency and competence.
Proven track record of making significant contributions by deploying and setting systems, at the same time bringing about
considerable cost reductions, while ensur ing efficiency and quality benchmarks of the projects. Proficiency in planning,
executing and spearheading construction projects involving method engineering, contract administration, resource planning
with a flair for adopting modern construction methodol ogies.
Deft in swiftly ramping up projects within defined time, cost and quality parameters. Proven expertise in handling project
costing, project budgeting, cost management, implementation of cost control measures, project planning & scheduling and
proje ct risk assessment. Resourceful in maintaining close cross -functional coordination and liaison with external bodies/
agencies for smooth project execution. Experienced in managing multi -ethnic work groups.
Well -versed with the safety standards and environm ent management regulations applicable to the industry, and has
consistently ensured compliance with the same across all assignments. An effective communicator with honed leadership,
team management & building, analytical, negotiation, problem -solving and o rganisational skills.
WORK EXPERIENCE
INTERNATIONAL
Organization M/s Maire Tecnimont Italy S. p. A. Viale Monte Grappa 3, 20124 Milano, Italy
Project AROMATIC COMPLEX PROJECT Shuaiba Industrial Area, Kuwait
Role Steel Structure & Piping Supervisor
Owner M/s PIC - Petrochemical Industries Company
PMC M/s BECHTEL
Tenure Nov 2008 to Sep 2009
Monitoring and execution of Steel structure erection activities including QC Documents.
Piping works -preparation for Hydro Test as per isometric Diagram (Drawing), Testing, flushing and Hook Ups as per P&I
Diagrams (Drawings).
Organization M/s. SK Engineering Construction. Korea
Project KOC FMP - KUWAIT: Gathering Center - 10 & 20
Role SUPERVISOR – Structural & Pipeline
Owner M/s Kuwait Oil Corporation
PMC M/s AMEC
Tenure May 2006 to Oct 2008
Overseeing welding activities, welding inspection, and NDT , including shutdown/ turnaround Pipe Re -erection & alignment of
piping works including Hydro testing as per Isometric Diagram (Drawing), Testing, flushing & Tie -in point (AG&UG) asper P& I
Diagrams ( Drawings).
Erection and Alignment of Heavy Pipe rack structures .
Organization M/s KUK JE Plant Co., Ltd. Korea
Project BUIPE – BOLGATANGA Petroleum Product Pipeline, GHANA. WEST AFRICA (OIL Project)
Role Quality Control Officer
Owner MINISTRY OF ENERGY, GHANA. BULK OIL STORAGE AND TRANSPORTATION CO.LTD
Contractor M/s SK Engineering& Construction. Korea.
PMC M/s PETROTECH SERVICES CO.LTD.
Tenure July 200 4 to Oct 200 5
Implementing QA/QC policies & Ensuring best Safety practices; Civil Trench Excavation, Pipe Lowering, Back Filling, Cathodic
Protection, Inspection and Hydro -Testing ( Water Filling& flushing with pigging system and Pre -Commissioning.) of 200 mm ∅
of total 128.50 KMs Length.
INDIA
Organization M/s Lanco Infratech Limited
Project Hindustan Petroleum Corporation Limited - R&D Complex Centre, Bangalore; GRIHA (Green Rating
for Integrated Habitat Assessment)
Role Project Manager
Owner M/s Hindustan Petroleum C orporatio n Limited
PMC M/s E I L (Engineers India Limited)
Consultants M/s Venkataramanan Associates -BLR
Tenure Sep 2016 to Aug 2018
Monitoring fund flow and disbursement; Preparation of cost estimates, Budget and project time schedule. Selecting appropriate
construction meth odology; civil works of Administrative block, Guest house, Auditorium, Labs, Pump house E O T crane support
structure, Substation Building, fabrication and erection of structural steel, Fire Fighting system and MEP including ETP&STP
works .
Organization M/s Lanco Infratech Limited
Project Indian Oil Corporation Limited, Pradeep Refinery. Orissa - Civil & Structural Works for Delayed
Coker Unit & Coke Handling System
Role Project Manager
Owner M/s Indian Oil Corporation Limited
PMC M/s Toyo Engineering India Private
Consultants M/s Foster Wheeler (AMEC Foster Wheeler)
Tenure Sep 2013 to Aug 2016
Supervising complete operations for project completion within allotted budget cost; construction activities as per constructi on
schedule; approved material submittals and Ensuring best Safety Practices; civil works like bridge crane support structure, Maze
pits, paving works, Pipe & Belt conveyors, Substation Building, vessels and соlumns (58,000cum concrete) Foundations . Steel
Structures Fabrication, Pre -Ass embling and Erection of 9,500 MT.
Organization M/s Lanco Infratech Limited
Project NTPC: Rihand Super Thermal Power Project: Civil & Structural Works for CRF Building, 2 X 500 MW -
Stage III, Rihand, Uttar Pradesh
Role Sr. Deputy General Manager
Owner M/s National Thermal Power Corporation
Tenure Nov 2012 to Aug 2013
Fabrication and Erection of Heavy Machinery work shop, Fabrication shop -I and II. Monitoring Civil, Structural Fabrication &
Erection of construction activities as per schedule. Maintain QA& QC standards, safety compliance with Company’s HSE policy .
Organization M/s Lanco Infratech Limited
Project Lanco Amarkantak TPS. 2x660MW, (Stage –II, UNIT III& IV), Korba, Chhattisgarh .(Coal Fired
Thermal)
Role Sr. Deputy Project Manager
Owner M/s Lanco Power Limited
Tenure Apr 2012 to Oct 2012
Erection works for Boiler Structures. Monitoring Structural (Heavy) Fabrication and Erection of CHP& PIPE RACK structures, an d
Transfer Points (China Structures) in coal Handling System -16,000 M T .
Organization M/s Lanco Infratech Limited - Kondapalli, Vijayawada. Tel. No.: 0866 -2872810
Project Lanco Kondapalli Power Limited (Combined Cycle) Stage –II, 1x366MW, Stage –III, 2X371MW IDA,
Kondapalli . (Naphtha/Gas -Based Combined Cycle )
Role Deputy Project Manager – Structural & Piping .
Owner M/s Lanco Power Limited .
Consultants M/s. Consulting Engineering Services (I) Pvt. Ltd.
Tenure Nov 2009 to May 2012
Monitoring of Structural (Heavy) Fabrication and Erection of 10,000 M T. Fabrication, Erection, Alignment, Testing &
Commissioning of C W Piping, A C W Piping, Clarified Piping and Cooling Circulated water Piping including Oil & Gas, and Power
Piping & Firefighting Pipe Line -preparation for Hydro Test as per isometric Diagram (Drawing ), Testing , flushing and Hook Ups
as per P&I Diagrams ( Drawings) .
Organization M/s Lanco Infratech Limited
Project CW System Package (on turnkey basis) for N T P C. At Ramagundam Super Thermal Power Project,
Stage III (1 x 500 MW)
Role Dy. Manager (Structural)
Owner M/s. National Thermal Power Corporation Ltd.
Contractor M/s. Hyosung –Ebara Company Ltd., Korea . (Joint Venture)
Consultants M/s. Consulting Engineering Services (I) Pvt. Ltd.
Tenure Jul 2002 to Jul 2004
Monitoring of Fabrication, Erection, Hydro -Testing and Commissioning of CW Piping/Ducts of 3200 ∅, 2200 ∅ and 1200 ∅ of
total 1000RM Length; Overseen erection, alignment & commissioning of CW Pumps -3 Nos Capacity -30,000 M³/Hr. Handling
Erection, alignment of Stop lock end Gates, Trash Rack including Secondary Embedment Parts. Looking after Structural
Fabrication & Erection of TG Building, EOT Crane (45 MT), Auxiliary Hoist (5 MT), Erection, Alignment & Load Test. All weldin g
activities, Welding inspection, Welders procedure specification (WPS), Implementing procedure qualification record (PQR) .
Organization M/s. ENCON SERVICES LIMITED
Project LANCO KONDAPALLI POWER LIMITED PROJECT. 355 MW CCPP (NAPHTHA/GAS -BASED COMBINED
CYCLE ). IDA, Kondapalli, Krishna District, AP .
Role Dy. Manager (Structural & Piping )
Owner M/s Lanco Kondapalli Power Ltd.
Client M/s Doosan Heavy Industries& Construction -South Korea .
Consultants M/s Fichtner Consulting Engineers (India) Pvt. Ltd.
Tenure Dec 1998 to Ju ne 2002
Structural Fabrication and Erection of Turbine hall and HRSG Structure 7,500 M T. Fabrication of Naphtha Storage Tanks (2 no -
each of 48 Mt. ∅, &12Mt. Height) of Floating Roof Type and HSD tanks (2 no - each of 14Mt. ∅, &10.5 Mt. Height) of Fixed roof
type; Erection, Alignment, Testing & Commissioning of C W PUMPs -3 Nos, A C W PUMPs -3 Nos River Water intake system:
involving mechanical works i.e. Erection Alignment and Commissioning of Pumps -3 No’s, stop lock gates, trash rack & traveling
water screen and pi ping. Fabrication, Erection, Alignment, Testing & Commissioning of C W Piping, A C W Piping
Organization M/s. P.C. P. Constructions Pvt.
Project M/s. EAST INDIA PETROLEUM . (Oil & Gas Projects)
Role Site Engineer
Owner East India Petroleum Ltd .
PMC M/s Lloyds Registers Limited.
Tenure Dec199 7 to Nov 1998
Overseeing welding activities, welding inspection, and NDT, Fabrication, erection & alignment of Oil & Gas piping works
including Hydro testing as per isometric Diagram (Drawing), Testing, flushing and Hook Ups as per P&I Diagrams (Drawings) ,
Commissioning and Handed over to the Client with all the QA&QC Documents.
Organization M/s. P.C. P. Constructions Pvt.
Project M/s Hindustan Petroleum Corporation Ltd, Visakhapatnam.
Role Site Engineer
Owner Hindustan Petroleum Corporation Ltd,
Client M/s. RINL (Visakhapatnam Steel Plant)
Tenure Dec199 6 to Nov 199 7
Civil foundations for structural requirements, Erection of соlumns, Assembly of all types of structures, Erection and Handing
over to the Client with all the QA&QC Documents .
Organization M/s. United Steel Allied Industries Pvt Ltd.
Project M/s RASHTRIYA ISPAT NIGAM LIMITED, Visakhapatnam.
Role Site Engineer
Owner M/s RINL (Visakhapatnam Steel Plant)
Consultants M/s M N Dastur & Co (P) Ltd, Kolkata.
Tenure Feb 19 85 to Nov 199 6
Civil foundations for structural requirements, Erection of соlumns, Assembly of all types of structures, Erection of junction
houses, flood light towers, coal wagon tipplers , Track& Ground Hoppers in Coal& Iran Ore Raw material handling system . Total
quantity of work was 18,000 MT; Fabrication, Assembling, Erection, Alignment and Handing over of heavy welded and riveted
girders (Welded Girders’ 50 MT Capacity each and 150 MT riveted girders) - commissioning of bloom continuous casting M/C
about 11,000 MT (For Steel Melting Shop) .
Monitoring of Fabrication, Erection, Hydro -Testing and Commissioning of Blast Furnace Pipe -26 00 ∅ , Cold Blast Pipe -2X 18 00
∅ , Coke Oven Pipe - 1200 ∅ Line , of 5.5 KMs.
EDUCATION
19 84 Diploma in Civil Engineering, L.C.E (Visakhapatnam) 1st Class with 77.75%.
State Board of Technical Education & Training, Hyderabad , Andhra Pradesh. INDIA .
AREAS OF EXPERTISE
Construction Management Project Execution Fabrication and Erection
Piping Works Quality Assurance Feasibility Study
Concrete works Structural Steel Planning Project Procurement
Oil & Gas, Steam & Water Lines Refinery Projects Testing (Hydro & Pneumatic)
Project Coordination Resource Dep loyment Documentation
Cutting Plans Implementation Flushing, Commissioning Cross County Pipe -Line
Hydro Test (Flushing with Pigging System) Commissioning - Spheres & Tanks Safety Compliances
Heavy Steel Structures: Boiler Structure HRSG Structure Proj ect Closure
Cost/ Risk Management Change Order Control Best Practice Establishment
Design/Detail Engineering Contract Management Liaison/ Business Networking
26 октября, 2016
Наталья
Город
Москва
Возраст
36 лет (17 мая 1988)
26 октября, 2016
Григорий
Город
Москва
Возраст
53 года (29 декабря 1969)
28 октября, 2016
Мадия
Город
Москва
Возраст
53 года ( 5 июня 1971)